DeterministicAuditablePermissionedContinuous Assurance
Phase 1 · Connect a plant · Verification

Build the model, with a human in the loop

Before anything goes live, the platform proposes and a person approves. This is the verification half: connect the systems, build the plant model, and govern the rules.

  1. 1Connect
  2. 2Plant model
  3. 3Ontology
  4. 4Rules
  5. 5Knowledge graph
Step 1 · Permissioned

Connect the systems of record

Each system is read through a permissioned connector, in its own native format. The same reactor shows up under a different identifier in every one, which is exactly what has to be reconciled.

DEXPI
Engineering · P&ID
Connecting…
EAM
Maintenance · EAM
Waiting
Historian
Historian
Waiting
OPC UA
Live control
Waiting
ERP
ERP
Waiting
Read-only, permissioned access. Nothing is written back to your systems.