Phase 1 · Define the project · Verification
Define the project, with a human in the loop
Before any site is scored, the platform proposes and a person approves. Connect the design, reconcile the equipment into one plant model, construct the concept ontology, and govern the rules that will drive the assessment.
- 1Connect
- 2Plant model
- 3Ontology
- 4Rules
- 5Knowledge graph
Step 1 · Permissioned
Connect the project sources
The platform reads the design and the land. Engineering, datasheet, and ERP carry the equipment, reconciled into one model. GIS, the geotechnical survey, and the environmental layers describe each candidate site and its terrain, which the assessment uses in Phase 2. Every source is read in its native format, permissioned and read-only.
DEXPI
Engineering · DEXPI P&ID
Connecting…
Datasheet
Equipment datasheet
Waiting
ERP
ERP
Waiting
GIS
GIS · sites + terrain (DEM)
Waiting
Geotech
Geotechnical survey
Waiting
FEMA
Environmental · FEMA / USACE
Waiting
Read-only, permissioned access. Nothing is written back to your systems.
